PRO DESIGN LLC

  • Home
    • About
    • Updates
  • Collections
    • Walden Select
    • Walden Premier
    • Natural Roller Shades
    • Fabric Roman Shades
    • Dual Sheer Shades
    • Natural Shades
    • Drapery Panels
  • Vendor Resources
  • Account Inquiry
  • Home
    • About
    • Updates
  • Collections
    • Walden Select
    • Walden Premier
    • Natural Roller Shades
    • Fabric Roman Shades
    • Dual Sheer Shades
    • Natural Shades
    • Drapery Panels
  • Vendor Resources
  • Account Inquiry

CURRENT PRODUCTION TIMES

The production times listed below are expected but not guaranteed. Production times are estimated for the time it will take your order to ship from our factory after it has been placed, and they do not include transit time for delivery.

​Orders for fabrics that are out of stock will carry longer production times.

Our production times are up-to-date as of January 12th, 2025.
  • Natural Shades
  • Walden Select
  • Walden Premier
  • Natural Roller Shades
  • Dual Sheer Shades
  • Fabric Roman Shades
  • Drapery Panels
<
>

NATURAL SHADES PRODUCTION TIMES

All fabrics are in stock.
Production times are as listed below:
Shades: 14 days
Sliding Panels & Natural Drapery: 28 days

WALDEN SELECT PRODUCTION TIMES

All fabrics are in stock.
Production times are as listed below:
Shades: 7 days
Sliding Panels & Natural Drapery: 28 days

WALDEN PREMIER PRODUCTION TIMES

All fabrics are in stock.
​Production Times are listed below:
Shades: 14 days
Sliding Panels & Natural Drapery: 28 days
​ ​

NATURAL ROLLER SHADES

All fabrics are in stock.​
​Production time is 14 days.

DUAL SHEER SHADES

These fabrics are out of stock until the end of January:​
  • Bryson Canvas (BY03)
  • Kane Bark (KN02) ​​
This fabric is out of stock until early February:​
  • Tory Cotton (TR01)
Production time is 10 days.

FABRIC ROMAN SHADES

All fabrics are in stock.​
​​​​Production time is 28 days.

DRAPERY PANELS

This component is out of stock until the end of January:
  • Black Drapery Brackets
Production time is 11 days.

MOTORIZATION TRANSITION TIMELINE

The motorization transition dates listed below are expected but not guaranteed. Transition dates are pending factory stock levels of the existing motorization parts and accessories. 
​

All transition dates below are up-to-date as of January 12th, 2025.
  • Natural Shades
  • Walden Select
  • Walden Premier
  • Natural Roller Shades
  • Dual Sheer Shades
  • Fabric Roman Shades
<
>

NATURAL SHADE TRANSITION TIMELINE

STANDARD REMOTE MOTOR USB-C: Began March 17th, 2025

POWER LIFT REMOTE MOTOR USB-C: Began September 12th, 2025.

​DC MOTOR:  Began May 28th, 2025

EXTERNAL BATTERY PACK:  Began October 11, 2025

​REMOTES: Began June 3rd, 2025

PRO WAND: Began October 1st, 2025

WALL SWITCH: Expected to transition January 2026

WALDEN SELECT

STANDARD REMOTE MOTOR USB-C: Began March 8th, 2025

POWER LIFT REMOTE MOTOR USB-C: Expected to transition March 2026

DC MOTOR:  Expected to transition January 2026

EXTERNAL BATTERY PACK:  Began October 7, 2025
​
​REMOTES: Began June 3rd, 2025

PRO WAND: Began October 1st, 2025

WALL SWITCH: Began October 24th, 2025

WALDEN PREMIER

STANDARD REMOTE MOTOR USB-C: Began March 4, 2025

POWER LIFT REMOTE MOTOR USB-C: Began December 16, 2025 

DC MOTOR:  Began October 10, 2025

EXTERNAL BATTERY PACK:  Began November 25, 2025

​REMOTES: Began June 3rd, 2025

PRO WAND: Began October 1st, 2025

WALL SWITCH: Expected to transition January 2026

NATURAL ROLLER TRANSITION TIMELINE​

STANDARD REMOTE MOTOR USB-C: Began March 17th, 2025
​

POWER LIFT REMOTE MOTOR USB-C: Began September 12th, 2025.

​DC MOTOR:  Began May 28th, 2025

EXTERNAL BATTERY PACK:  Began October 11, 2025

​REMOTES: ​Began June 3rd, 2025

PRO WAND: Began October 1st, 2025

​WALL SWITCH: Expected to transition January 2026

DUAL SHEER SHADE TRANSITION TIMELINE

STANDARD REMOTE MOTOR USB-C: Began February 18th, 2025
​

DC MOTOR:  Began August 21, 2025

EXTERNAL BATTERY PACK:  Began August 6th, 2025
​

​REMOTES: Began June 3rd, 2025

PRO WAND: Began June 3rd, 2025

​WALL SWITCH: Expected to transition January 2026

FABRIC ROMAN SHADE TRANSITION TIMELINE

STANDARD REMOTE MOTOR USB-C: Began April 14th, 2025

​DC MOTOR:  Began May 14th, 2025

EXTERNAL BATTERY PACK:  Began September 3rd, 2025

POWER LIFT REMOTE MOTOR USB-C: Began July 30th, 2025

PRO WAND: Began October 1st, 2025

​REMOTES: Began June 3rd, 2025

​
WALL SWITCH: Began December 12, 2025
Email: [email protected]
Phone: 330-562-0023
Fax: 928-447-1087
CA SB 1215 Covered Battery - Embedded Product Chemistry Disclosure
Picture